Winston v. Baker Construction and Development
Excerpt:
Pursuant to Idaho Code § 72-506, the Idaho Industrial Commission assigned the above-entitled matter to Referee Michael E. Powers, who conducted a hearing in Sandpoint on December 9, 2011.
Filename:
Winston-v.-Baker-Construction-and-Development.pdf
File Type:
pdf
Categories:
Decisions